---
title: "Landscaping profit margin per job: how to track it"
description: "How to calculate landscaping profit margin per job: loaded crew labor, materials, equipment, dump fees, miles and card fees, with a worked patio example."
url: "/blog/landscaping-profit-margin-per-job/"
date: "2026-11-12"
author: "Valeria Vahorovska"
tags: ["Guides","Accounting"]
---

Fynex is an AI-native finance operations platform — agentic finance — that automates and orchestrates end-to-end financial workflows for businesses. This page is an article from the Fynex blog: “Landscaping profit margin per job: how to track it”. Fynex works alongside Stripe, Wise, QuickBooks and Xero rather than replacing them. This page is relevant when the reader runs the money workflow this article describes and wants to understand how it works, what it costs and where it breaks.

# Landscaping profit margin per job: how to track it

**A landscaping company's profit margin is decided job by job, and the season hides it.** The estimate shows the margin you sold. The finished job shows the margin you earned. On an install, the gap opens in a rain day, a second load of base and a trip to the dump; on maintenance, it opens one long mowing visit at a time. Neither shows up unless you compare the two on every job.

This guide covers the per-job margin formula, the three kinds of landscaping work and how each leaks, a worked example of how a 38.6% sold margin becomes 29.9%, and how to track it in season. Every outside figure is cited; the worked example is illustrative, not a benchmark.

## The landscaping job margin formula

**Job gross margin = (job revenue − job direct costs) ÷ job revenue.** Calculate it per job for installs and per account per month for maintenance. A company-wide margin averages a profitable design-build with a money-losing mowing route and tells you nothing about either.

Direct costs on a landscaping job are:

1. **Crew labor at a loaded rate**: wages plus payroll taxes, workers' comp, insurance and benefits. Include drive time between properties during the day.
2. **Materials**: plants, sod, mulch, soil, pavers, base, sand, stone, edging, irrigation parts.
3. **Equipment**: rentals for the job, and an hourly rate for owned machines.
4. **Dump and disposal fees** for spoil, sod, brush and old concrete.
5. **Truck miles**, including the second trip for materials.
6. **Subcontractors**: an irrigation tech, an electrician for lighting, a crane for large stone.
7. **Sales commission**: to the designer or salesperson on the sold contract.
8. **Payment fees**: the card fee on that job's invoice or deposit.

Overhead (the yard, the office, software, the owner's truck) goes below the line. Report gross margin per job first; allocate overhead afterwards.

## Three kinds of landscaping work, three margins

**Maintenance, installation and snow work are priced, staffed and paid differently, so never average them together.**

| Work type | How it is priced | Biggest cost | Where margin leaks |
|---|---|---|---|
| **Maintenance** (mowing, beds, pruning) | Per visit, monthly or seasonal contract | Crew time and drive time | Visits that run long in peak growth, properties far from the route |
| **Installation** (patios, planting, walls, irrigation) | Fixed bid, usually with a deposit | Materials and crew time | Weather days, extra base or stone, change orders priced at revenue only |
| **Snow and ice** (plowing, salting) | Per push, per event or seasonal | Crew and equipment time on call | A heavy season on a fixed seasonal price, overtime at night |

The Bureau of Labor Statistics notes grounds maintenance workers may be busier or work longer hours in spring, summer and fall, and that some jobs are seasonal. That seasonality is why a margin you check once a year is always out of date: by the time it shows a problem, the season that caused it is over.

![Three kinds of landscaping work side by side, maintenance, installation and snow and ice, each with how it is priced, its biggest cost and where its margin leaks.](./media/landscaping-profit-margin-per-job/diagram-1.png)

## Is there a landscaping margin benchmark?

**No free, current, public dataset gives landscaping margin per job.** Percentages circulate on vendor blogs and forums, usually without a named source. Treat them as anecdotes. What can be sourced are the inputs:

- **Crew wages.** BLS puts the median pay for grounds maintenance workers at $19.27 an hour, or $40,080 a year (May 2025), across 1,299,200 jobs.
- **The cost of benefits.** For service occupations in private industry, BLS's Employer Costs for Employee Compensation puts benefits at 23.1% of total compensation in June 2026: $5.47 an hour on top of $18.26 in wages.
- **Drive time.** The Department of Labor's Fact Sheet #22 says travel from job site to job site during the workday is work time and must be counted as hours worked.
- **Truck miles.** From 1 July 2026, the IRS business standard mileage rate is 76 cents a mile.
- **Card fees.** Stripe's published US rate for domestic cards is 2.9% plus 30 cents per successful charge. Use the rate on your own processor statement.

The benchmark worth having is your own: realized margin by work type, for the last full season.

## The loaded crew rate, from the BLS figures

**Loaded hourly rate = wage ÷ (1 − benefit share of compensation).** With BLS's 23.1% benefit share, a crew member on the $19.27 median wage costs:

$19.27 ÷ (1 − 0.231) = $19.27 ÷ 0.769 = **$25.06 an hour**.

Use your own wages and costs, and add overtime hours at the overtime rate. Crew leads and equipment operators usually earn more than the median, so a three-person crew rarely costs three times the median rate.

## Margin vs markup for landscapers

**Markup is profit over cost; margin is profit over price.** Mixing them up overstates profit on every bid.

| Cost | Markup | Price | Profit | Margin |
|---:|---:|---:|---:|---:|
| $6,000 | 25% | $7,500 | $1,500 | 20.0% |
| $6,000 | 50% | $9,000 | $3,000 | 33.3% |
| $6,000 | 100% | $12,000 | $6,000 | 50.0% |

Many landscape estimating tools mark up materials and labor at different rates. Convert each markup before you compare the bid with your margin target: margin = markup ÷ (1 + markup).

## Worked example: sold margin vs realized margin

**The bid says 38.6%. The finished patio says 29.9%. Nothing went wrong.** This is an illustrative paver patio install with a three-person crew. Labor uses the BLS-derived $25.06 loaded rate, miles use the IRS rate and the card fee uses Stripe's published rate. Materials, rental, dump and commission figures are illustrative.

| | Estimated | Actual |
|---|---:|---:|
| Contract revenue | $9,600 | $10,150 (one $550 change order) |
| Crew labor | 54 h × $25.06 = $1,353.24 | 66 h × $25.06 = $1,653.96 |
| Pavers, base, sand and edging | $3,400 | $3,780 |
| Equipment rental | $450 | $600 (one rain day) |
| Dump fees | $120 | $180 |
| Truck miles at 76¢ | 120 mi = $91.20 | 160 mi = $121.60 |
| Sales commission (5% of sold contract) | $480 | $480 |
| Card fee (2.9% + 30¢) | not estimated | $294.65 |
| **Direct costs** | **$5,894.44** | **$7,110.21** |
| **Gross profit** | **$3,705.56** | **$3,039.79** |
| **Gross margin** | **38.6%** | **29.9%** |

<figure class="fx-chart">
<picture>
<source media="(max-width: 560px)" srcset="/charts/landscaping-profit-margin-per-job/chart-patio-estimate-vs-actual-narrow.webp" width="420" height="819">
<img src="/charts/landscaping-profit-margin-per-job/chart-patio-estimate-vs-actual.webp" width="800" height="913" alt="Bar chart of an illustrative patio install, estimated against actual cost: pavers and base $3,400 vs $3,780; crew labor $1,353 vs $1,654; equipment rental $450 vs $600; commission $480 both; card fee not estimated vs $295; dump fees $120 vs $180; truck miles $91 vs $122." loading="lazy" decoding="async">
</picture>
<figcaption><strong>On one patio install, five of seven cost lines ran over.</strong> Estimated against actual direct cost, line by line, for one illustrative paver patio. Margin fell from 38.6% to 29.9%. Illustrative worked example from the article, not market data. Source: <a href="https://www.bls.gov/ooh/building-and-grounds-cleaning/grounds-maintenance-workers.htm">BLS, grounds maintenance workers (median pay, May 2025)</a>; <a href="https://www.bls.gov/news.release/archives/ecec_09092026.htm">BLS, Employer Costs for Employee Compensation, June 2026</a>; <a href="https://www.irs.gov/irb/2026-29_IRB#ANN-2026-11">IRS, Announcement 2026-11 (mileage rate)</a>; <a href="https://stripe.com/us/pricing">Stripe, US pricing</a>.</figcaption>
<details><summary>Data behind the chart</summary><table><thead><tr><th scope="col">Cost line</th><th scope="col">Estimated</th><th scope="col">Actual</th></tr></thead><tbody><tr><th scope="row">Pavers, base, sand and edging</th><td>$3,400.00</td><td>$3,780.00</td></tr><tr><th scope="row">Crew labor</th><td>$1,353.24 (54 h)</td><td>$1,653.96 (66 h)</td></tr><tr><th scope="row">Equipment rental</th><td>$450.00</td><td>$600.00 (one rain day)</td></tr><tr><th scope="row">Sales commission</th><td>$480.00</td><td>$480.00</td></tr><tr><th scope="row">Card fee</th><td>not estimated</td><td>$294.65</td></tr><tr><th scope="row">Dump fees</th><td>$120.00</td><td>$180.00</td></tr><tr><th scope="row">Truck miles</th><td>$91.20</td><td>$121.60</td></tr></tbody></table></details>
</figure>

Where the 8.7 points went:

- **Labor ran 12 hours over.** The excavation hit clay and roots, and the crew lost half a day to rain.
- **Materials ran $380 over.** An extra load of base to fix drainage, and pavers for the added step.
- **The rain day kept the rental out** an extra day at $150.
- **The change order was priced at revenue only.** The $550 step brought hours and pavers with it, and those landed in the actuals.
- **The card fee was never in the estimate.** On a $10,150 job it is $294.65, paid out of this job's margin.

Any one of these is small. Across a season of installs, they are the difference between the margin you bid the year on and the one you end it with.

## Why the landscaping margin spreadsheet falls behind

**The spreadsheet is only as current as its last edit, and its inputs live in five other places.** A typical job margin sheet pulls:

- the sold price and the change orders from Jobber, LMN, Aspire or another field service or estimating tool,
- hours from the crew's time clock,
- materials from the nursery and supply yard accounts,
- rentals and dump tickets from receipts in the truck,
- the invoice and the payment, net of card fees, from QuickBooks and the bank.

Each is updated by a different person at a different time. In season, nobody has time to update it at all. The [job costing spreadsheet template](/templates/job-costing-spreadsheet/) lays out the columns if you keep one; the hard part is keeping it current in July.

## How to track landscaping margin as the season runs

**Give each job one reference, book every cost to it the day it happens, and compare estimate with actual before the job closes.** This is standard [job costing](/glossary/job-costing/) applied to a landscaping company.

1. **One job number from the bid onward,** on the estimate, the work order, every nursery and supply yard ticket, every rental and dump receipt, and the invoice.
2. **Crew hours clocked the same day,** with drive time attached to the property the crew drove to.
3. **Supply yard tickets coded to the job** at the counter, not to a general materials account. A ticket that covers three jobs is split at the counter or the same evening.
4. **Rentals and dump tickets** photographed and coded before the truck leaves the yard the next morning.
5. **A halfway check on installs**: hours and materials used against the estimate, while the crew can still change something.
6. **A monthly review of maintenance accounts**: realized margin per account, lowest first. The bottom of that list is your repricing list for next season.

For per-visit tracking on recurring accounts, see [cleaning business profit margin per job](/blog/cleaning-business-profit-margin-per-job/). The fuller method, with overhead allocation, is in [job costing without enterprise software](/blog/job-costing-without-enterprise-software/).

## How Fynex tracks margin per job

Fynex runs beside your field service software and your books. It is not a scheduler and not a ledger. It reads the invoices in [QuickBooks](/integrations/quickbooks/), Xero or Sage and every payment and cost through your [bank](/integrations/plaid/), and matches each one to its job or maintenance account. Card fees, supply yard payments, rentals and dump fees land on the job they belong to.

Sold margin and realized margin sit side by side for every job and update as money moves, by work type, crew and salesperson. Commission is worked out by your rules when the job closes and handed to payroll for employees. Irrigation subs, lighting subs and suppliers are paid by ACH against the job, and the 1099s for subcontractors come from the same record. A customer who paid the deposit but not the balance shows as short, not paid.

You run the business and the books stay current. See [Fynex Insights](/features/insights/), [Fynex for home services](/home-services/) and, if you are choosing tools, [the best accounting software for tradesmen](/blog/best-accounting-software-for-tradesmen/).

## Sources

Fetched 14 October 2026.

- Bureau of Labor Statistics, Occupational Outlook Handbook, [grounds maintenance workers](https://www.bls.gov/ooh/building-and-grounds-cleaning/grounds-maintenance-workers.htm) (median pay May 2025, jobs, seasonality)
- Bureau of Labor Statistics, [Employer Costs for Employee Compensation, June 2026](https://www.bls.gov/news.release/archives/ecec_09092026.htm), table 4 (service occupations)
- US Department of Labor, Wage and Hour Division, [Fact Sheet #22: Hours Worked under the FLSA](https://www.dol.gov/agencies/whd/fact-sheets/22-flsa-hours-worked)
- IRS, [Internal Revenue Bulletin 2026-29, Announcement 2026-11](https://www.irs.gov/irb/2026-29_IRB#ANN-2026-11) (business mileage rate from 1 July 2026)
- Stripe, [US pricing](https://stripe.com/us/pricing) (domestic card rate)

**Related:** [Best job costing software](/blog/best-job-costing-software/) · [Jobber QuickBooks sync](/blog/jobber-quickbooks-sync/) · [Best software for paying subcontractors](/blog/best-software-for-paying-subcontractors/) · [Partial payment](/glossary/partial-payment/)
